NATIONAL TECHNOLOGY & ENGINEERING SOLUTIONS OF SANDIA, LLC | Department of Energy | IGF::CL,CT::IGF CONTRACT AWARD DE-NA0003525 TO THE NATIONAL TECHNOLOGY&ENGINEERING SOLUTIONS OF SANDIA, LLC (NTESS) FOR THE MANAGEMENT AND OPERATION OF THE DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION'S SANDIA NATIONAL LABORATORIES (SNL) | $42.77B | Jan 2017 – Apr 2027 | NM | View ↗ |
UT-BATTELLE LLC | Department of Energy | MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY | $42.26B | Oct 1999 – Mar 2030 | TN | View ↗ |
LAWRENCE LIVERMORE NATIONAL SECURITY, LLC | Department of Energy | TAS::89 0240::TAS THIS PERFORMANCE-BASED MANAGEMENT CONTRACT (PBMC) IS FOR THE MANAGEMENT AND OPERATION OF THE LAWRENCE LIVERMORE NATIONAL LABORATORY (LLNL). THE CONTRACTOR SHALL, IN ACCORDANCE WITH THE PROVISIONS OF THIS CONTRACT, ACCOMPLISH THE MISSIONS AND PROGRAMS ASSIGNED BY THE U.S. DEPARTMENT OF ENERGY (DOE) AND MANAGE AND OPERATE THE LABORATORY. THE LABORATORY IS ONE OF DOES OFFICE OF DEFENSE PROGRAM MULTI-PROGRAM LABORATORIES. THE LABORATORY IS A FEDERALLY FUNDED RESEARCH AND DEVELOPMENT INSTITUTION (ESTABLISHED IN ACCORDANCE WITH THE FEDERAL ACQUISITION REGULATION (FAR) PART 35 AND OPERATED UNDER THIS MANAGEMENT AND OPERATING (M&O) CONTRACT, AS DEFINED IN FAR 17.6 AND DEAR 917.6. | $41.32B | May 2007 – Sep 2031 | CA | View ↗ |
TRIAD NATIONAL SECURITY, LLC | Department of Energy | IGF::CL::IGF COMPETITION FOR MANAGEMENT AND OPERATION OF LOS ALAMOS NATIONAL LABORATORY | $35.14B | Jun 2018 – Oct 2028 | NM | View ↗ |
LOCKHEED MARTIN CORPORATION LMT ↗ | Department of Defense | LRIP LOT 12 ADVANCE ACQUISITION CONTRACT | $35.14B | Nov 2017 – Mar 2031 | TX | View ↗ |
ELECTRIC BOAT CORPORATION | Department of Defense | SSN 802 AND 803 LONG LEAD TIME MATERIAL | $34.94B | Feb 2017 – Jun 2036 | CT | View ↗ |
CONSOLIDATED NUCLEAR SECURITY, LLC | Department of Energy | IGF::CL,CT::IGF MANAGEMENT AND OPERATING CONTRACT FOR Y-12 NATIONAL SECURITY COMPLEX, PANTEX PLANT, WITH AN OPTION FOR SAVANNAH RIVER TRITIUM OPERATIONS | $34.40B | Jan 2013 – Sep 2027 | TN | View ↗ |
THE BOEING COMPANY BA ↗ | Department of Defense | KC-X MODERNIZATION PROGRAM | $31.97B | Feb 2011 – Jul 2027 | WA | View ↗ |
ELECTRIC BOAT CORPORATION | Department of Defense | COLUMBIA CLASS DESIGN COMPLETION | $31.08B | Sep 2017 – Dec 2031 | CT | View ↗ |
BATTELLE MEMORIAL INSTITUTE | Department of Energy | BATTELLE MEMORIAL INSTITUTE/PACIFIC NORTHWEST LABORATORY OPERATING AND MANAGING CONTRACT | $30.67B | Sep 1978 – Sep 2027 | WA | View ↗ |
LOCKHEED MARTIN CORPORATION LMT ↗ | Department of Defense | THE PURPOSE OF THIS MODIFICATION IS TO AWARD F-35A LRIP 15 USAF AIRCRAFT* LONG LEAD FUNDING | $30.14B | Nov 2019 – Jun 2028 | TX | View ↗ |
SAVANNAH RIVER NUCLEAR SOLUTIONS LLC | Department of Energy | MANAGEMENT AND OPERATING CONTRACT FOR THE SAVANNAH RIVER SITE. | $27.58B | Jan 2008 – Sep 2026 | SC | View ↗ |
BATTELLE ENERGY ALLIANCE, LLC | Department of Energy | MANAGEMENT AND OPERATIONS OF THE INL | $26.29B | Nov 2004 – Sep 2029 | ID | View ↗ |
LOCKHEED MARTIN CORPORATION LMT ↗ | Department of Defense | THE PURPOSE OF THIS CONTRACT IS TO AWARD LONG LEAD FUNDING FOR F-35A, F-35B, AND F-35C AIRCRAFT FOR U.S. SERVICES, NON-DOD PARTNERS, AND FMS CUSTOMERS | $24.55B | Dec 2022 – Apr 2031 | TX | View ↗ |
THE BOEING COMPANY BA ↗ | National Aeronautics and Space Administration | INTERNATIONAL SPACE STATION | $22.44B | Nov 1993 – Sep 2026 | TX | View ↗ |
LOCKHEED MARTIN SERVICES, LLC | Department of Energy | MANAGEMENT AND OPERATION OF Y-12 PLANT AND OTHER PROGRAMS | $20.65B | Apr 1984 – Feb 2027 | TN | View ↗ |
THE REGENTS OF THE UNIVERSITY OF CALIFORNIA | Department of Energy | THIS PERFORMANCE-BASED MANAGEMENT CONTRACT (PBMC) IS FOR THE MANAGEMENT AND OPERATION OF THE ERNEST ORLANDO LAWRENCE BERKELEY NATIONAL LABORATORY (LBNL). THE CONTRACTOR SHALL, IN ACCORDANCE WITH THE PROVISIONS OF THIS CONTRACT, ACCOMPLISH THE MISSIONS AND PROGRAMS ASSIGNED BY THE U.S. DEPARTMENT OF ENERGY (DOE) AND MANAGE AND OPERATE THE LABORATORY. THE LABORATORY IS ONE OF THE DOE?S OFFICE OF SCIENCE (SC) MULTI-PROGRAM LABORATORIES. THE LABORATORY IS A FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) ESTABLISHED IN ACCORDANCE WITH THE FEDERAL ACQUISITION REGULATION (FAR) PART 35 AND OPERATED UNDER THIS MANAGEMENT AND OPERATING (M&O) CONTRACT, AS DEFINED IN FAR 17.6 AND DEAR 917.6. | $19.87B | Jun 2005 – May 2030 | CA | View ↗ |
THE BOEING COMPANY BA ↗ | Department of Defense | USN P-8A FRP II LONG LEAD MATERIAL | $18.11B | Aug 2014 – Nov 2027 | WA | View ↗ |
HONEYWELL FEDERAL MANUFACTURING & TECHNOLOGIES, LLC | Department of Energy | IGF::CL,CT::IGF MANAGEMENT AND OPERATION OF THE NATIONAL SECURITY CAMPUS -- CONTRACT NO. DE-NA0002839 | $17.57B | Jul 2015 – Sep 2030 | MO | View ↗ |
UCHICAGO ARGONNE, LLC | Department of Energy | PERFORMANCE-BASED CONTRACT FOR MANAGEMENT AND OPERATION OF ARGONNE NATIONAL LABORATORY | $17.42B | Jul 2006 – Sep 2031 | IL | View ↗ |
BECHTEL NATIONAL, INC. | Department of Energy | — | $17.32B | Dec 2000 – Apr 2027 | WA | View ↗ |
LOCKHEED MARTIN CORP LMT ↗ | National Aeronautics and Space Administration | TAS::80 0124::TAS DESIGN, DEVELOPMENT, TEST&EVALUATION OF PROJECT ORION | $15.58B | Sep 2006 – Apr 2027 | CO | View ↗ |
THE LELAND STANFORD JUNIOR UNIVERSITY | Department of Energy | OPERATION AND MAINTENANCE LINEAR ACCELLERATOR | $14.93B | Nov 1978 – Sep 2027 | CA | View ↗ |
FLUOR MARINE PROPULSION, LLC | Department of Energy | MANAGEMENT AND OPERATION OF THE NAVAL NUCLEAR LABORATORY AND NAVAL NUCLEAR PROPULSION PROGRAM SUPPORT | $14.75B | Jul 2018 – Sep 2028 | PA | View ↗ |
FLUOR MARINE PROPULSION, LLC | Department of Defense | NAVAL NUCLEAR LABORATORY | $14.68B | Jul 2018 – Sep 2028 | PA | View ↗ |
NORTHROP GRUMMAN SYSTEMS CORP | Department of Defense | GROUND-BASED STRATEGIC DETERRENT (GBSD) ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD) AND EARLY PRODUCTION AND DEPLOYMENT (P&D) | $13.72B | Sep 2020 – Mar 2029 | UT | View ↗ |
HUNTINGTON INGALLS INC | Department of Defense | CVN 80 ENGINEERING EFFORTS AND STEEL | $12.75B | May 2016 – Jun 2036 | VA | View ↗ |
LOCKHEED MARTIN CORPORATION LMT ↗ | Department of Defense | LRIP 11 AAC | $12.27B | Dec 2015 – Mar 2031 | TX | View ↗ |
ALLIANCE FOR ENERGY INNOVATION, LLC | Department of Energy | AWARD OF CONTRACT TO MANAGE AND OPERATE THE NATIONAL RENEWABLE ENERGY LABORATORY | $10.95B | Jul 2008 – Sep 2028 | CO | View ↗ |
THE BOEING COMPANY BA ↗ | National Aeronautics and Space Administration | PROVIDE DEVELOPMENTAL HARDWARE AND TEST ARTICLES, AND MANUFACTURE AND ASSEMBLE ARES I UPPER STAGES. THE UPPER STAGE (US) ELEMENT IS AN INTEGRAL PART OF THE ARES I LAUNCH VEHICLE AND PROVIDES THE SECOND STAGE OF FLIGHT. THE US ELEMENT IS RESPONSIBLE FOR THE ROLL CONTROL DURING THE FIRST STAGE BURN AND SEPARATION; AND WILL PROVIDE THE GUIDANCE AND NAVIGATION, COMMAND AND DATA HANDLING, AND OTHER AVIONICS FUNCTIONS FOR THE ARES I DURING ALL PHASES OF THE ASCENT FLIGHT. THE US ELEMENT IS A NEW DESIGN THAT EMPHASIZES SAFETY, OPERABILITY, AND MINIMUM LIFE CYCLE COST. THE OVERALL DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E), PRODUCTION, AND SUSTAINING ENGINEERING EFFORTS INCLUDE ACTIVITIES PERFORMED BY THREE ORGANIZATIONS; THE NASA DESIGN TEAM (NDT), THE UPPER STAGE PRODUCTION CONTRACTOR (USPC) AND THE INSTRUMENT UNIT PRODUCTION CONTRACTOR (IUPC). FOR CLARITY, THE USPC WILL BE REFERRED TO AS THE CONTRACTOR THROUGHOUT THIS DOCUMENT. NASA IS RESPONSIBLE FOR THE INTEGRATION OF THE PRIMARY ELEMENTS OF THE ARES I LAUNCH VEHICLE INCLUDING: THE FIRST STAGE, US INCLUDING INSTRUMENT UNIT (IU), AND US ENGINE; AND WILL ALSO INTEGRATE THE ARES I LAUNCH VEHICLE AT THE LAUNCH SITE. NASA IS RESPONSIBLE FOR THE DDT&E, INCLUDING TECHNICAL AND PROGRAMMATIC INTEGRATION OF THE US SUBSYSTEMS AND GOVERNMENT-FURNISHED PROPERTY. NASA WILL LEAD THE EFFORT TO DEVELOP THE REQUIREMENTS AND SPECIFICATIONS OF THE US ELEMENT, THE DEVELOPMENT PLAN AND TESTING REQUIREMENTS, AND ALL DESIGN DOCUMENTATION, INITIAL MANUFACTURING AND ASSEMBLY PROCESS PLANNING, LOGISTICS PLANNING, AND OPERATIONS SUPPORT PLANNING. DEVELOPMENT, QUALIFICATION, AND ACCEPTANCE TESTING WILL BE CONDUCTED BY NASA AND THE CONTRACTOR TO SATISFY REQUIREMENTS AND FOR RISK MITIGATION. NASA IS RESPONSIBLE FOR THE OVERALL UPPER STAGE VERIFICATION AND VALIDATION PROCESS AND WILL REQUIRE SUPPORT FROM THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR THE MANUFACTURE AND ASSEMBLY OF THE UPPER STAGE TEST FLIGHT AND OPERATIONAL UPPER STAGE UNITS INCLUDING THE INSTALLATION OF UPPER STAGE INSTRUMENT UNIT, THE GOVERNMENT-FURNISHED US ENGINE, BOOSTER SEPARATION MOTORS, AND OTHER GOVERNMENT-FURNISHED PROPERTY. A DESCRIPTION OF THE NASA MANAGED AND PERFORMED EFFORTS IS CONTAINED IN THE US WORK PACKAGES AND WILL BE MADE AVAILABLE TO THE CONTRACTOR TO ENSURE THEIR UNDERSTANDING OF THE ROLES AND RESPONSIBILITIES OF THE NDT, IUPC, AND CONTRACTOR DURING THE DESIGN, DEVELOPMENT, AND OPERATION OF THE US ELEMENT. THE US CONCEPTUAL DESIGN DESCRIBED IN THE USO-CLV-SE-25704 US DESIGN DEFINITION DOCUMENT (DDD) IS THE BASELINE DESIGN FOR THIS CONTRACT. THE CONTRACTORS EARLY ROLE WILL BE TO PROVIDE PRODUCIBILITY ENGINEERING SUPPORT TO NASA VIA THE ESTABLISHED US OFFICE STRUCTURE AND TO PROVIDE INPUTS INTO THE FINAL DESIGN CONFIGURATION, SPECIFICATIONS, AND STANDARDS. NASA WILL TRANSITION THE MANUFACTURING AND ASSEMBLY, LOGISTICS SUPPORT INFRASTRUCTURE, CONFIGURATION MANAGEMENT, AND THE SUSTAINING ENGINEERING FUNCTIONS TO THE CONTRACTOR AT THE KEY POINTS DURING THE DEVELOPMENT AND IMPLEMENTATION OF THE PROGRAM CURRENTLY PLANNED TO OCCUR NO LATER THAN 90 DAYS AFTER THE COMPLETION OF THE FOLLOWING MAJOR MILESTONES: MANUFACTURING AND ASSEMBLY US PRELIMINARY DESIGN REVIEW (PDR) LOGISTICS SUPPORT INFRASTRUCTURE US PDR CONFIGURATION MANAGEMENT US CRITICAL DESIGN REVIEW CDR) SUSTAINING ENGINEERING US DESIGN CERTIFICATION REVIEW (DCR) AFTER THE COMPLETION OF AN ORDERLY TRANSITION OF ROLES AND RESPONSIBILITIES TO THE CONTRACTOR, NASA WILL ASSUME AN INSIGHT ROLE INTO THE CONTRACTORS PRODUCTION, SUSTAINING ENGINEERING, AND OPERATIONS SUPPORT OF THE ARES I US TEST PROGRAM AND FLIGHT HARDWARE. AFTER DCR, THE CONTRACTOR WILL BE RESPONSIBLE FOR SUSTAINING ENGINEERING PER SOW SECTION 4.7, AS NECESSARY TO MAINTAIN AND SUPPORT THE US CONFIGURATION AND FOR PRODUCTION AND OPERATIONS SUPPORT. | $10.52B | Sep 2007 – Dec 2028 | AL | View ↗ |
LOCKHEED MARTIN CORPORATION LMT ↗ | Department of Defense | THE CONTRACT AWARD IS FOR THE FY21/FY22/FY23 BASE AND OPTION PRICING FOR PHASE ARRAY TRACKING RADAR TO INTERCEPT ON TARGET (PATRIOT) ADVANCED CAPABILITY-3 (PAC-3) PRODUCTION REQUIREMENTS FOR THE UNITED STATES (US) AND FOREIGN MILITARY SALES (FMS) | $10.48B | Apr 2020 – Sep 2033 | TX | View ↗ |
LOCKHEED MARTIN CORPORATION LMT ↗ | Department of Defense | EXECUTE PHASED ARRAY TRACKING RADAR TO INTERCEPT ON TARGET (PATRIOT) ADVANCED CAPABILITY-3 (PAC-3) MISSILE PRODUCTION BY PROVIDING INCIDENTAL SERVICES, HARDWARE, FACILITIES, EQUIPMENT, AND TECHNICAL, PLANNING, MANAGEMENT, AND MANUFACTURING EFFORTS. | $9.99B | Jun 2024 – Sep 2030 | TX | View ↗ |
HUMANA GOVERNMENT BUSINESS INC | Department of Defense | TRICARE MANAGED CARE SUPPORT SERVICES CONTRACT, 5TH GENERATION EAST REGION | $9.27B | Feb 2023 – Dec 2029 | KY | View ↗ |
LOCKHEED MARTIN CORPORATION LMT ↗ | Department of Defense | HQ0147-17-C-0032 UNDEFINITIZED CONTRACT ACTION (UCA) FOR THAAD INTERCEPTOR LOT 9 PRODUCTION - QTY OF 23 | $9.10B | Mar 2017 – Nov 2028 | TX | View ↗ |
BROOKHAVEN SCIENCE ASSOCIATES LLC | Department of Energy | IGF::OT::IGF TAS::89 0222::TAS M&O CONTRACT FOR BNL | $8.62B | Jan 2015 – Jan 2030 | NY | View ↗ |
NORTHROP GRUMMAN SYSTEMS CORPORATION | Department of Defense | E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7) | $8.48B | Feb 2018 – Feb 2030 | FL | View ↗ |
THE AEROSPACE CORPORATION | Department of Defense | FY19 ENGINEERING SERVICES | $8.44B | Oct 2018 – Sep 2028 | CA | View ↗ |
TRIWEST HEALTHCARE ALLIANCE CORP | Department of Defense | TRICARE MANAGED CARE SUPPORT SERVICES CONTRACT, 5TH GENERATION WEST REGION | $8.42B | Jan 2024 – Dec 2026 | AZ | View ↗ |
LOCKHEED MARTIN CORPORATION LMT ↗ | Department of Defense | FY21-23 GLOBAL F-35 AIR SYSTEM SUSTAINMENT | $7.95B | Dec 2020 – Dec 2027 | TX | View ↗ |
MISSION SUPPORT & TEST SERVICES LLC | Department of Energy | IGF::CL,CT::IGF CONTRACT AWARD DE-NA0003624 TO THE MISSION SUPPORT AND TEST SERVICES LLC (MSTS) FOR THE MANAGEMENT AND OPERATION OF THE DEPARTMENT OF ENERGY NATIONAL NUCLEAR SECURITY ADMINISTRATION'S NEVADA NATIONAL SECURITY SITE. | $7.66B | Aug 2017 – Nov 2027 | NV | View ↗ |
LOCKHEED MARTIN CORPORATION LMT ↗ | Department of Defense | CY24 AVSC SUPPLY SUPPORT | $7.65B | Jun 2024 – Sep 2033 | VA | View ↗ |
THE BOEING COMPANY BA ↗ | Department of Defense | — | $7.63B | Jun 2004 – Aug 2026 | WA | View ↗ |
RTX CORPORATION RTX ↗ | Department of Defense | LOT 15 FMS-1 F135 CTOL PROP SYSTEM | $7.50B | Mar 2020 – Oct 2030 | CT | View ↗ |
THE BOEING COMPANY BA ↗ | Department of Defense | W58RGZ-16-C-0023 IS FOR THE AWARD OF ADVANCE PROCUREMENT IN THE AMOUNT OF $184,930,000.00 TO SUPPORT LOT 7 FULL RATE PRODUCTION LONG LEAD ITEMS. | $7.47B | Mar 2016 – Mar 2028 | AZ | View ↗ |
LOCKHEED MARTIN CORP LMT ↗ | Department of Defense | NEXT GENERATION OVERHEAD PERSISTENT INFRARED GEOSYNCHRONOUS EARTH ORBIT SPACE VEHICLE 1-3 PHASE 1 | $7.46B | Aug 2018 – Jul 2029 | CA | View ↗ |
LOCKHEED MARTIN CORPORATION LMT ↗ | Department of Defense | LONG RANGE ANTI-SHIP MISSILE/JOINT AIR-TO-SURFACE STANDOFF MISSILE LARGE LOT PROCUREMENT | $7.20B | Sep 2024 – Jan 2033 | FL | View ↗ |
HUNTINGTON INGALLS INCORPORATED | Department of Defense | CONSTRUCTION OF DDG 51 SHIPS FY23-27 | $6.99B | Aug 2023 – Feb 2034 | MS | View ↗ |
THE BOEING COMPANY BA ↗ | Department of Defense | F-15, FMS, F-15QA AIR VEHICLE DEVELOPMENT | $6.99B | Dec 2017 – Nov 2027 | MO | View ↗ |
HUNTINGTON INGALLS INCORPORATED | Department of Defense | FY18-FY22 DDG 51 CLASS SHIP CONSTRUCTION | $6.94B | Sep 2018 – Jul 2032 | MS | View ↗ |
BELL BOEING JOINT PROJECT OFFICE | Department of Defense | CMV-22 PRODUCTION LOT 22 LONG LEAD-TIME ITEMS | $6.88B | Dec 2016 – Apr 2027 | TX | View ↗ |